National Iranian Copper Industries Co ( Filter Press) 

فیلتر پرس مس سر چشمه

The complete package of dewatering from Sarcheshme copper phase 2 copper mine as EPC

  1. 3 filter press machines with 1500*1500 mm plate size of chamber and membrane type, fully automatic with simultaneous washing system
  2. Making drip tray and shoot box
  3. Construction of cake discharge conveyor belt (belt feeder)
  4. Construction of a homogenizer tank
  5. Slurry feeding pump
  6. Air compressor + tank

 

 

 



Category :

status :

Start year :

Running time :

Employer :

-

Location :

-

Other projects

1455(2)

Babak Mining Company ( Filter Press )

فیلتر پرس مس سر چشمه

National Iranian Copper Industries Co ( Filter Press) 

فیلتر پرس گل گهر

Golgohar Mining and Industrial Company (Filter Press)

احیا سپاهان

Ahya spahan iron ironstone mines (Filter Press)

فیلتر پرس شرکت قند پیرانشهر

Piranshahr Sugar Company (Filter Press)

فیلتر پرس شرکت قند لرستان

Lorestan Sugar Company ( Filter Press )

پارس خودرو5

Pars Khodro (Filter Press)

سایپا-6

Saipa (Filter Press)

سانتریفوژ غیر مداوم هفت تپه2

Haft Tappeh Sugarcane Agro-Industry Co (Batch Centrifugal)

تربت جام7

Tarbat Jam Sugar Company (Batch Centrifugal)

بلت فیدر گلگهر2

Golgohar Mining and Industrial Company (belt feeder)

تیکنر گلگهر 1

Golgohar Mining and Industrial Company ( Tickener)